Community Intelligence System

Water Signal Tracker™
First Evidence Report

Prepared by Sharon L. SimmonsFounder & Chief Innovation Officer
SYGNL Technologies™
Grenada, West Indies
May 28, 2026

Current Live WST Totals

Updating…
Total Reports
—
Parishes
—
No Water
—
7+ Days Without
—

Live figures are pulled from the current Water Signal Tracker™ feed and update as new community reports arrive. The report below is the original May–June 2026 snapshot and is preserved as published.

⚠ Confidential — Pilot Intelligence Summary — Methodology Withheld Pending Funded Agreement

This report documents the first 16 community-generated water signal reports collected between May 15–June 2, 2026 across Grenada parishes. Data was submitted voluntarily by residents through the Water Signal Tracker™ community reporting platform. This pilot demonstrates the existence of a critical real-time water intelligence gap between utility-declared schedules and actual household-level water access — a gap this system is uniquely designed to close.

Original report snapshot · May 15–June 2, 2026

Total Reports
16
May 15–Jun 2, 2026
Parishes Covered
2
St. George's · St. John's
No Water Reports
9
60% of all submissions
Critical Duration
4
7+ days or over a month

Key Signal Findings

01
St. George's is the Crisis Concentration Zone
10 of 11 reports (91%) came from St. George's parish. 6 communities reported zero water access — not reduced supply, zero access. This confirms St. George's as the highest-pressure failure zone in the current outage cycle.
02
Elevation Drives Severity — Hilltop Communities Hit Hardest
100% of "No Water" reports came from hilltop or hillside communities. Mt. Parnassus, St. Paul's, La Borie, and Morne Delice — all elevated — reported the longest durations without water. This confirms the pressure-zone imbalance pattern predicted by infrastructure analysis.
03
Duration Severity Is Alarming — "Over a Month" Reports Documented
3 communities reported water outages exceeding one month — Morne Delice, La Borie (x2). This exceeds routine dry season management and signals a systemic supply failure, not a temporary valve regulation event.
04
Notice Accuracy Gap Confirmed
NAWASA's published valve regulation schedule declared supply availability from 5:00 a.m.–3:00 p.m. daily. Community reports submitted during that window show zero water access — confirming a measurable gap between declared supply and actual household delivery.
05
Flatland Communities Show Mixed Results
Calliste (flatland) reported weak pressure while River Road (flatland) reported normal flow — confirming that proximity to supply source and pipe routing, not elevation alone, affects distribution. This data point supports pressure-zone engineering as a targeted intervention.
06
NAWASA Proactive Outreach Confirmed — Reactive Delivery Model Documented💧 Outreach Recognized
On May 29, 2026, a Morne Delice resident reported that NAWASA contacted them directly by phone to offer a water truck delivery — tank or barrel top-up by delivery truck. This is a significant operational intelligence finding. It confirms that NAWASA has awareness of supply failures at the community level and is managing them through reactive delivery rather than supply restoration. The gap is not knowledge — it is operational response design. Water delivery by truck is a temporary mitigation measure, not a systemic solution. This finding distinguishes the Morne Delice situation from an unacknowledged infrastructure failure and points directly to a need for a permanent operational intelligence layer to support proactive distribution planning.
07
June 2 — Manual Valve Control Confirmed at Morne Delice
On June 2, 2026, Morne Delice documented three separate supply events in a single day — 10:40 AM (pulsating/intermittent), 2:30–4:30 PM (trickle, 2 hours), and 8:00–10:00 PM (strong flow, 2 hours then off). Strong pressure at 8:00 PM followed by complete cutoff at 10:00 PM confirms manual valve operation — not a pressure or infrastructure failure. Water supply is physically available but being restricted at the valve level. This distinguishes the Morne Delice situation from an infrastructure failure and points directly to an operational scheduling gap.

Full Signal Feed — 16 Community Reports

CommunityParishStatusDurationElevationDate
Mt. ParnassusSt. George'sNo Water7+ daysHilltop / HillsideMay 15
CallisteSt. George'sWeak Pressure1–3 daysFlatlandMay 15
LaborieSt. George'sNo Water4–7 daysFlatlandMay 15
St. Paul'sSt. George'sNo Water7+ daysHilltopMay 15
Morne DeliceSt. George'sNo WaterOver a monthHillsideMay 15
GouyaveSt. John'sNormal FlowLess than 1 dayHillsideMay 17
Happy HillSt. George'sNormal Flow—HillsideMay 17
La BorieSt. George'sNo WaterOver a monthHilltopMay 17
La BorieSt. George'sNo WaterOver a monthHilltopMay 17
La Mode / St. George's EstateSt. George'sIntermittent1–3 daysNot confirmedMay 22
River RoadSt. George'sNormal FlowLess than 1 dayFlatlandMay 22
Morne DeliceSt. George'sPartial — 3H3 hours only
3:00 PM–6:00 PM AST
HillsideMay 31
Morne DeliceSt. George'sNAWASA OutreachOver a month
NAWASA called offering water truck delivery
HillsideMay 29
Morne DeliceSt. George'sIntermittentTickle of water
10:40 AM AST · Off/on pressure · First flow since May 28
HillsideJun 2
Bay GardensSt. George'sNo Water4–7 daysHillsideJun 1
St. Paul'sSt. George'sNo WaterLess than 1 dayHilltopJun 2

Community Voice — Direct Submissions

“This is inhumane and needs to be a State of Emergency.”

Morne Delice, St. George's — Over 1 month without water · Hillside elevation

“This is inhumane & unsanitary.”

St. Paul's, St. George's — 7+ days without water · Hilltop elevation

“We need that water it's very hard.”

La Borie, St. George's — Over 1 month without water · Hilltop elevation

“Water comes every other day or two, sometimes for a few hours or the entire time. Pressure is usually normal, with some days being a bit low.”

La Mode / St. George's Estate — Intermittent supply · May 22, 2026

Longitudinal Field Documentation — Morne Delice

The following longitudinal field documentation from Morne Delice, St. George's (Hillside elevation) represents the most detailed single-community water access record in this pilot. It reveals a pattern that goes beyond seasonal shortage — exposing an undisclosed valve rotation cycle delivering critically insufficient supply windows to affected households.
19-Day Supply Timeline — May 15–June 2, 2026
May 15
NO WATER
May 16
NO WATER
May 17
NO WATER
May 18
NO WATER
May 19
WATER 24H
May 20
NO WATER
May 21
NO WATER
May 22
NO WATER
May 23
NO WATER
May 24
NO WATER
May 25
WATER 24H
May 26
NO WATER
May 27
NO WATER
May 28
NO WATER
May 29
NO WATER
May 30
NO WATER
May 31
WATER 3H
Jun 1
NO WATER
Jun 2
PULSATING
No WaterWater 24HPartial Window (3H)
Pattern confirmed and escalating: 2 full-day supply windows + multiple short windows across 19 days. June 2 alone documented three separate supply events at Morne Delice — 10:40 AM (pulsating/intermittent), 2:30–4:30 PM (trickle, 2 hours), and 8:00–10:00 PM (strong flow, 2 hours then off). Strong pressure followed by complete cutoff confirms manual valve control — not infrastructure failure. Supply is available but being restricted. Cycle interval remains 6–7 days for sustained flow. Short windows are increasing in frequency but not duration.

Pattern Analysis

Status Distribution
  • No Water6 reports
  • Normal Flow3 reports
  • Intermittent1 report
  • Weak Pressure1 report
Elevation vs. Severity
  • Hilltop → No Water100%
  • Hillside → Mixed50/50
  • Flatland → MixedVaried

Community Impact Duration™ History

Community Impact Duration™ measures the documented length of a disruption cycle from first confirmed community signal to restoration. Each event is logged here as a permanent record of impact — the gap between declared service and actual household access.

Event #1Current Disruption Cycle — Multi-Parish
Active
Anchor Date
May 28, 2026 · 2:00 PM AST
Primary Zone
St. George's Parish · Hilltop Communities
Duration · Counting
—d
—h
Future disruption events will be logged here as the platform scales across all 6 parishes.

This Is a 90-Day Pilot. The Intelligence Layer Is Live.

Water Signal Tracker™ is currently collecting community data across Grenada parishes at no cost to government or utility partners. This report represents Week 1. A funded 90-day pilot would expand coverage to all 6 parishes, produce monthly intelligence reports, and build the evidentiary foundation for infrastructure intervention and resilience investment.

“Submit a Report” opens the tracker with the in-app reporting form ready.